Runners training on a floodlit synthetic athletics track
SYNTHETIC TRACK SYSTEMS

Tracks built for grip, drainage and long service life.

Full-PUR, sandwich, spray-coat and prefabricated systems — base to line marking, delivered as one scope.

End-to-end execution · World Athletics-spec marking · Field events included

A track is a drainage project with a rubber surface on top.

Synthetic tracks fail for one of two reasons — the base was not laid to the right fall, or the system was too thin for the traffic it carries. Both are decided long before the rubber goes down. We build the base and the surface, so the specification and the execution are the same responsibility.

We deliver for universities, schools, sports authorities, academies and corporate campuses — 400m eight-lane and six-lane tracks, 200m compact loops, and the field event areas that go with them.

Track systemsFull-PUR, sandwich system, spray-coat, prefabricated rolled rubber
Track configurations400m 8-lane, 400m 6-lane, 200m compact
Lane width1.22m standard
Base typeAsphalt or concrete, laid to fall
Surface thickness13mm and above, by system and usage
Installation time60–120 days depending on configuration and civil scope
MaintenanceWash down seasonally; re-top cycle advised at survey

Four track systems, four different jobs.

System choice is a trade between grip, weather tolerance, lifespan and budget. Here is what separates them.

Synthetic athletics track lanes under floodlights
COMPETITION

Full-PUR System

A fully impermeable polyurethane system built up in layers. The highest specification we lay — best energy return, longest life and the system competition venues specify.

  • Best for:Universities and competition venues
  • Feel:Firm, high energy return
  • Price band:Premium
Group running on a synthetic track surface
BEST BALANCE

Sandwich System

A rubber base layer with a PUR-bound wearing course on top. Close to full-PUR performance at a meaningfully lower cost — the practical choice for most institutions.

  • Best for:Schools, academies, campuses
  • Feel:Balanced grip and cushioning
  • Price band:Mid-range
Running shoes on a textured track surface
VALUE

Spray-Coat System

A rubber base with a sprayed PUR and granule finish. The most economical synthetic system, suited to school tracks with moderate daily use.

  • Best for:School tracks and training loops
  • Feel:Textured, moderate cushioning
  • Price band:Value
Prefabricated rubber track rolls being installed
FAST INSTALL

Prefabricated Rolled Rubber

Factory-made rubber rolled out and bonded on site. Consistent quality, quick installation and minimal weather dependency during laying.

  • Best for:Tight programmes and monsoon windows
  • Feel:Consistent, springy
  • Price band:Premium

Compare the options

 Full-PUR SystemSandwich SystemSpray-Coat SystemPrefabricated Rolled Rubber
Playing feelFirm, high energy returnBalanced gripTextured, moderateConsistent, springy
Shock absorptionHighHighMediumHigh
Indoor / OutdoorOutdoorOutdoorOutdoorOutdoor
Weather resistanceExcellent — impermeableVery goodGoodVery good
LifespanLongestLongModerateLong
Maintenance effortLowLowModerate — re-top soonerLow
Typical use caseCompetition venuesSchools and academiesSchool training loopsFast-programme builds

Handed over ready to play.

Site survey & feasibility

Land area checked against 400m or 200m geometry and levels.

Base & civil works

Asphalt or concrete base laid to fall, with kerbing and edges.

Drainage channels

Perimeter and infield drainage sized for heavy monsoon runoff.

Surface supply & installation

PUR, sandwich, spray or prefabricated system laid to thickness.

Field events

Long jump pit, shot put circle, steeplechase and high jump apron.

Line marking, QC & handover

Lane and event marking to World Athletics geometry, then handover.

From first visit to first game.

1
2–4 days

Site survey & measurement

Levels taken and track geometry checked against the land.

2
7–10 days

Design, system selection & drawings

Configuration, thickness and drainage design finalised.

3
3–5 days

Quotation & timeline lock

Base, surface, field events and marking in one quotation.

4
60–120 days

Civil works & surface installation

Base construction and curing, then the synthetic system.

5
5–7 days

Line marking, QC & handover

Lane geometry set out, measured and handed over.

Recent work.

Floodlit track
Floodlit track
School athletics track
School athletics track
Surface detail
Surface detail
Campus sports complex
Campus sports complex
Infield courts
Infield courts
Track lighting
Track lighting

Who we build for.

Schools & universitiesPrivate academiesClubs & resortsCorporate campusesResidential societies

Questions buyers actually ask.

Spray-coat is the most economical synthetic system and works well for school tracks with moderate daily use. If the track will also host inter-school meets or run all day, the sandwich system is worth the step up — it lasts considerably longer under traffic and costs less over its life than re-topping a thin track early.

Tell us about your court.

  • Reply within one working day
  • Free site assessment
  • No obligation quote
Planning a athletics track court?Free site assessment · Quote in 48 hours