Indoor swimming pool with marked lanes and overhead lighting
TURNKEY AQUATIC BUILDS

Pools delivered as one accountable scope.

Competition, training, learner and leisure pools — excavation to water treatment, handed over swim-ready.

Single-contractor accountability · Filtration & treatment included · Optional AMC

One contract, one team, one point of accountability.

Most pool projects go wrong in the gaps — between the civil contractor, the waterproofing agency, the tiler and whoever supplies the filtration. Battledore takes the whole scope, so there is nobody to point at when the shell leaks or the pump room underperforms.

We build for schools and universities, academies, clubs and resorts, corporate campuses and residential societies — from learner pools to semi-Olympic training tanks, with the plant room, dosing and deck delivered as part of the same build.

Pool sizes50m × 25m, 25m × 12.5m, and custom to site
Depth optionsLearner 0.9–1.2m; training 1.2–1.8m; competition to spec
Shell typeRCC cast in situ
Filtration & circulationSand, cartridge or UV-assisted systems sized to volume
Tiling & finishesGlass mosaic or ceramic, anti-skid coping and deck
Installation time90–180 days depending on size and shell type
MaintenanceDaily dosing and skimming; optional annual maintenance contract

Pool types we build.

Size, depth and plant room all follow from who is going to swim in it. Start with the use, not the dimension.

Indoor competition swimming pool with lane ropes
COMPETITION

Competition & Semi-Olympic Pools

50m and 25m tanks built to competition dimensions with lane marking, starting blocks and deck-level or skimmer circulation.

  • Best for:Universities, academies, sports authorities
  • Feel:Competition specification
  • Price band:Premium
Swimmer training in a marked lane
TRAINING

Training Pools

Shorter tanks sized to the site, built for daily squad training and lessons rather than meets. The most practical build for most schools.

  • Best for:Schools and swim academies
  • Feel:Daily training use
  • Price band:Mid-range
Shallow pool water surface detail
LEARNER

Learner & Kids' Pools

Shallow, gently graded tanks with anti-skid surrounds and separate circulation, usually built alongside a main pool.

  • Best for:Schools, societies, resorts
  • Feel:Shallow and safe
  • Price band:Value
Resort leisure pool with blue tiled finish
LEISURE

Leisure & Resort Pools

Free-form and geometric leisure pools with beach entries, seating ledges and feature lighting for hotels and residential projects.

  • Best for:Resorts, hotels, societies
  • Feel:Leisure specification
  • Price band:Premium
Panel pool system installation
ON REQUEST

Prefabricated & Panel Systems

Steel or composite panel shells that cut wet-work time substantially where the ground conditions and programme suit.

  • Best for:Tight programmes and constrained sites
  • Feel:Faster build
  • Price band:Mid-range

Compare the options

 Competition & Semi-Olympic PoolsTraining PoolsLearner & Kids' PoolsLeisure & Resort PoolsPrefabricated & Panel Systems
Typical size50m × 25m25m × 12.5mCustom, shallowFree-formSite-specific
Build timeLongestLongShorterLongShortest
Shell typeRCCRCCRCCRCCPanel
Depth range1.8m+1.2–1.8m0.9–1.2m1.0–1.5m1.2–1.5m
LifespanLongestLongLongLongGood
Maintenance effortHigh — full plant roomModerateLowModerateModerate
Typical use caseCompetition and meetsSquad training and lessonsLearners and childrenResorts and societiesTight programmes

Handed over ready to play.

Excavation & shell

Setting out, excavation and RCC or panel shell construction.

Waterproofing & tiling

Membrane waterproofing, then mosaic or ceramic tiling and coping.

Filtration & pump room

Plant room built out with pumps, filters and valves sized to volume.

Plumbing & circulation

Inlets, outlets, skimmers or deck-level channel and balance tank.

Dosing & water treatment

Chlorination or UV-assisted dosing, with testing and commissioning.

Deck, lighting & handover

Anti-skid deck, underwater lighting, staff walkthrough and handover.

From first visit to first game.

1
2–4 days

Site survey & feasibility

Ground conditions, water source, drainage and access checked.

2
7–14 days

Design, drawings & system sizing

Pool layout plus filtration and plant room sized to volume.

3
3–5 days

Quotation & timeline lock

Civil, MEP and finishes in one quotation with a fixed programme.

4
90–180 days

Construction & installation

Shell, waterproofing, tiling, plant room and deck.

5
5–10 days

Commissioning, QC & handover

Fill, balance, test water and train your staff.

Recent work.

Indoor training pool
Indoor training pool
Lane marking detail
Lane marking detail
Squad training
Squad training
Leisure pool
Leisure pool
Campus facility
Campus facility
Resort pool
Resort pool

Who we build for.

Schools & universitiesPrivate academiesClubs & resortsCorporate campusesResidential societies

Questions buyers actually ask.

RCC is the default for permanent institutional pools: it takes any shape, handles difficult ground and lasts longest. Panel systems go up faster and suit tight programmes or constrained sites, but are less forgiving of poor ground. We assess soil and access at survey and recommend on that basis, not on what is quicker to sell.

Tell us about your court.

  • Reply within one working day
  • Free site assessment
  • No obligation quote
Planning a swimming pool court?Free site assessment · Quote in 48 hours