Aerial view of outdoor tennis courts surrounded by greenery
ITF-STANDARD COURTS

Tennis courts that play true, season after season.

Acrylic hard courts and modular tile systems, built from the base up with fencing, nets and floodlighting included.

End-to-end execution · ITF-standard line marking · Pan-India installation

The base decides the court. The surface decides the game.

A tennis court carries more load, over a larger area, than almost any other surface we build. Get the base and the fall right and the court plays true for years; get it wrong and no amount of acrylic will save it. We build the whole thing, so there is no gap between civil and surfacing.

We deliver single courts and multi-court facilities for schools, academies, clubs and resorts, corporate campuses and residential societies — including fencing, net systems, umpire chairs, windbreaks and floodlighting.

Surface optionsAcrylic hard court (cushioned / non-cushioned), PP interlocking tiles, synthetic grass and clay on request
Standard court size23.77m × 10.97m (doubles)
Recommended fenced area36.6m × 18.3m per court
Run-off behind baseline6.4m recommended for competitive play
Sub-base requiredConcrete or asphalt laid to fall; we execute or correct
Installation time21–45 days per court including civil works
MaintenanceWash down seasonally; acrylic repaint cycle advised at survey

Cushioned, non-cushioned or modular.

The choice comes down to how much your players' joints matter, how fast you want the court to play and how quickly you need it running.

Blue cushioned acrylic tennis hard court with white line marking
CLUB STANDARD

Cushioned Acrylic Hard Court

Acrylic built over rubber cushion layers. Noticeably easier on knees and backs over long sessions, and the surface most clubs and academies specify.

  • Best for:Academies, clubs and resorts
  • Feel:Firm but forgiving
  • Price band:Premium
Player on an outdoor acrylic hard tennis court
MOST COMMON

Non-Cushioned Acrylic

The classic acrylic hard court — direct build-up over concrete or asphalt. Fast, true and the most cost-effective way to a proper ITF-standard court.

  • Best for:Schools, societies, corporate campuses
  • Feel:Fast and firm
  • Price band:Mid-range
Modular tile tennis court surface in blue and green
MODULAR

PP Interlocking Tiles

Snap-together tiles that drain instantly and go down in days over a level base. Low maintenance and simple to repair section by section.

  • Best for:Fast installs and flood-prone sites
  • Feel:Slightly slower, quick-drying
  • Price band:Value
Clay tennis court surface with baseline markings
ON REQUEST

Synthetic Grass & Clay

Sand-dressed synthetic grass or clay for facilities that want a slower, softer game. Higher upkeep, distinctive play.

  • Best for:Resorts and specialist academies
  • Feel:Slow, soft underfoot
  • Price band:Premium

Compare the options

 Cushioned Acrylic Hard CourtNon-Cushioned AcrylicPP Interlocking TilesSynthetic Grass & Clay
Playing feelFirm but forgivingFast and firmSlightly slowerSlow, soft
Shock absorptionHighLowMediumHigh
Indoor / OutdoorBothBothOutdoorOutdoor
Weather resistanceGood — UV stableGood — UV stableExcellent — drains instantlyNeeds managed drainage
LifespanLong with repaint cycleLong with repaint cycleLong outdoorsDepends on upkeep
Maintenance effortLowLowVery lowHigh — regular dressing
Typical use caseAcademies and clubsSchools and societiesFlood-prone or fast buildsResorts and specialists

Handed over ready to play.

Site survey & feasibility

Plot checked for full court plus run-off, fall and drainage path.

Sub-base / civil works

Concrete or asphalt base laid to uniform fall, edges and kerbing.

Surface supply & installation

Cushion and colour coats built up, or tiles laid to line.

ITF-standard line marking

Singles, doubles and service lines set out to ITF dimensions.

Net posts, nets & umpire chair

Posts foundationed, nets tensioned, umpire chair and windbreaks fitted.

Fencing, floodlighting & handover

3–4m chain-link fencing, pole floodlights and handover.

From first visit to first game.

1
1–2 days

Site survey & measurement

Court plus run-off marked out on the actual plot.

2
3–5 days

Layout, surface selection & drawings

Orientation, drainage and surface build-up finalised.

3
2 days

Quotation & timeline lock

Civil, surface, fencing and lighting in one quotation.

4
21–45 days

Civil works & surface installation

Base construction, curing, then acrylic build-up.

5
2–3 days

Line marking, QC & handover

ITF marking, net height check and handover.

Recent work.

Multi-court facility
Multi-court facility
Cushioned acrylic court
Cushioned acrylic court
Club court
Club court
Modular tile court
Modular tile court
Clay court
Clay court
Resort court
Resort court

Who we build for.

Schools & universitiesPrivate academiesClubs & resortsCorporate campusesResidential societies

Questions buyers actually ask.

If players are on court for hours at a time, yes. Cushion layers absorb impact that otherwise goes into knees and lower backs, and academies notice the difference in how long juniors can train. For a school or society court used a few hours a day, non-cushioned acrylic is perfectly good and meaningfully cheaper.

Tell us about your court.

  • Reply within one working day
  • Free site assessment
  • No obligation quote
Planning a lawn tennis court?Free site assessment · Quote in 48 hours